How long should a quote stay valid when material prices move?

You quote a bathroom in March. The customer accepts in June and wants it done in September. In that time the copper, the fittings and the tiles have all gone up, and your margin has quietly shrunk. The fix isn't to quote higher and hope. It's two lines on every quote: how long the price holds, and what happens after that.

3.9%
was the rise in input prices to house construction over the twelve months to the September quarter 2026, according to the Australian Bureau of Statistics.

Why an open-ended quote is a risk

A quote with no expiry date is a promise with no end. The customer can sit on it for months and accept it at a price that no longer covers your costs. The ABS producer price figures show how fast some inputs move: in the year to the September quarter 2026, electrical equipment inputs to house construction rose 14.5% and plumbing products rose 9.4%. For a sparky or a plumber, materials can shift a lot inside a single season.

This post is about protecting your quotes from that movement, not the price trends themselves. For what's rising and why, see building material prices in 2026.

Pick a validity period that suits the job

There's no single legal period you must use. What matters is that it's clear, written on the quote, and realistic for how quickly your materials move. A few rules of thumb:

  • Small, labour-heavy jobs: a longer validity is fine, because there's little material exposure.
  • Material-heavy jobs, especially copper, cable, pipe and fittings: keep it shorter.
  • Big jobs that will start months after acceptance: a short validity for accepting, plus a clear clause about price changes before the start.
  • Supplier quotes: never promise a customer longer than your supplier has promised you.

Write it where it can't be missed

Put the validity at the top, near the total, not buried in the fine print. Use a real date rather than "thirty days", so nobody argues about when the clock started.

This quote is valid until the date shown above. If you accept after that date, we'll check our material prices and confirm the total before booking the job in.

Accepted, but starting months away

Validity covers how long the customer has to say yes. The harder case is a job accepted now and started much later, which is common while trades are stretched. Here you have three honest options.

  1. 1Fix the price and buy the key materials now, so the cost is locked in. Simple for the customer, but it ties up your cash.
  2. 2Fix the labour and treat named materials as provisional, with a written allowance and an agreement to adjust to actual cost with receipts.
  3. 3Include a price-change clause for named materials, with a cap and notice, so the customer knows the worst case before they sign.

Whatever you choose, say it in plain words on the quote, and explain it out loud. Customers accept price movement far better when it was flagged up front than when it arrives on the invoice. If you're unsure whether to call it a quote or an estimate, see quote vs estimate in Australia.

Keep price-rise clauses fair

Terms that go on every quote are standard form terms, and unfair terms in standard form contracts with consumers and small businesses are prohibited under the Australian Consumer Law. A clause that lets you raise the price for any reason, by any amount, without notice is the kind of thing that's likely to be seen as one-sided. A fair clause usually:

  • names the materials it applies to, rather than "all costs";
  • ties any rise to your actual supplier price, shown with a receipt or price list;
  • has a cap, or lets the customer cancel without penalty if the rise goes over it;
  • requires you to give notice before the work starts, not after it's finished.

This is general information rather than legal advice. Some states have specific rules for building contracts, so check yours for larger jobs.

Trade prices are moving too

It isn't only materials. The Housing Industry Association has noted that trades prices have increased by double the broader rate of wage growth across the economy since 2019. If you subcontract part of a job, the subbie's price can move during a long wait just like copper can. Get their quote's validity in writing too, and match yours to it.

Make expiry part of your follow-up

A validity date is also a natural reason to get back in touch. A friendly note a few days before a quote expires often gets a decision: "Just a heads up, your quote is good until Friday. Happy to lock it in if you're ready." There's more on timing in how to follow up a quote.

Agentize helps here. The Quoter builds an itemised, GST-sorted quote from your own rate card, so when your supplier prices change you update the rate card once and every new quote picks it up. It never invents a price: a line that isn't on your card is left blank and flagged. Quotes go out as a link the customer opens on their phone, and Agentize tracks the ones that have gone quiet and drafts a follow-up nudge in your voice for you to approve before it's sent.

Two lines on every quote, a validity date and a fair rule for what happens after it, will save more margin than any amount of padding the price.